Driveway & Rear Patio, Chapel Allerton

This was a 2 part project that encompassed both the front Driveway area and a new rear Patio\Step construction. We removed part of large hedge to make the entrance to the property bigger. We excavated then placed weed control and drainage and new man holes into the driveway to give a solid base for the fantastic looking Driveline Elise Pebble Grey blocks to be set on. We bordered the drive with a Brindle colour to really bring out the shades in the blocks.

The rear of the property needed some landscaping to it. We broke out the concrete base of the garage that had been removed, and dug foundations for the steps and patio that were reinforced with Railway Sleepers. These moulded into the large, newly shaped flower bed, running the length of the rear garden. We finished the Patio and New Step with the elegant looking Marshall’s Heritage product.

A very pleasing project that gave this property a beautiful makeover.

Comments are closed.